DRAFT · NOT FOR OPERATIONAL USESite/HSE approval required
All scenariosBESSWERGS-PC-BESS-05
BESS RESPONSE GUIDE

Vehicle / Mobile Plant Incident

STOP · SEPARATE · ASSIST

In immediate danger?Move to safety. Raise the alarm. Call Triple Zero.CALL 000
01
DO THIS NOW

Immediate actions

  1. 1

    Stop work and prevent a secondary collision or plant movement.

  2. 2

    Raise the alarm and notify the Control Room.

  3. 3

    Keep outside traffic, crush, suspended-load and unstable-plant zones.

  4. 4

    Isolate plant only if trained, authorised and safe.

  5. 5

    Call Triple Zero (000) for injury, entrapment, fire, spill or immediate danger.

  6. 6

    Provide first aid from a safe position and preserve emergency access.

02
RECOGNISE

Signs and triggers

  • Collision, rollover, struck person or trapped occupant
  • Unstable vehicle, plant, load or damaged structure
  • Fuel, oil, coolant, smoke, fire or battery damage
  • Contact with electrical services, pipework or site infrastructure
!
DO NOT

Actions that increase the risk

  • Do not enter a crush zone or stand downhill of unstable plant.
  • Do not move a vehicle, load or casualty unless needed to prevent immediate harm.
  • Do not approach plant in contact with an electrical line.
  • Do not restart or reposition damaged equipment.
  • Do not allow traffic through the incident area.
03
SUPPORTING RESPONSE

Role-based actions

Person discovering the incident

  • Stop nearby work, stay visible and warn approaching traffic.
  • Report vehicle/plant type, location, injuries and hazards.

Incident controller / traffic control

  • Set an exclusion zone and separate people from traffic and unstable equipment.
  • Establish a safe emergency access route and account for personnel.

Authorised plant / technical support

  • Provide plant energy, load, battery/fuel and stability information.
  • Do not recover equipment until emergency services release the scene and a plan is approved.
04
EMERGENCY-SERVICES HANDOVER

Information to provide

  • Exact access point and position of involved plant
  • Number and condition of injured or trapped people
  • Plant type, load, energy sources, fuel/battery and stability
  • Electrical, chemical, fire or environmental hazards
  • Isolation actions completed or still required
  • Traffic controls and safe responder approach
05
WHEN THE IMMEDIATE DANGER HAS PASSED

Recovery and reporting

  • Keep the scene and equipment secured until released.
  • Quarantine involved vehicles, plant and lifting equipment.
  • Preserve telematics, CCTV, permits, pre-starts and witness details.
  • Manage spills and damaged batteries under the relevant response plan.
  • Approve recovery and return to service through competent assessment.

Approved reference sources

This draft must be checked against the site emergency plan, OEM procedures, SDS, local law and emergency-service direction.

Safe Work Australia — Emergency plans and proceduresSafeWork NSW — Traffic management
EmergencyCall 000